jump to navigation

Running the Beer Lines November 24, 2009

Posted by James in Uncategorized.
add a comment

This weekend we began running the beer lines in the table and adding the shanks and faucets.

 

The refrigerator we bought will accommodate two 5 gallon cornelius style kegs. The kegs will be "bridged" together so that they drain at the same time reducing the number of times we have to change them out.

The refrigerator is placed inside the table center and the beer lines running to each tap are placed on top. They will join together and run into the hole cut in the top of the fridge.

 

 

Advertisements

Construction is Complete November 2, 2009

Posted by James in Uncategorized.
1 comment so far

 

This past Sunday we took advantage of the extra hour from daylight savings and a few extra hands to help give us a push to complete the construction and finishing phases. ¬†All that’s left to do now is run the beer lines and install the kegerator.

 

2009-11-01 16.23.38

Here is the table in its new home. It will remain my friend's new kitchen table until one of us can put it in a dedicated game room.